Research & Development

Research for the built environment.

Four applied research programmes in lightweight structures, bridge rehabilitation, robotic fabrication and building component reuse. Each starts with a prototype or a test that an industrial partner can help define.

We use our in-house workflow automation to streamline structural analysis and evaluate ultra-lightweight design concepts.

Discuss an R&D pilot

Flagship

Carbon-reinforced floors for rooftop extensions

Can a lighter precast floor make an additional storey feasible within an existing building’s load budget?

Concept visualisation of a ribbed concrete rooftop floor, with a carbon-fibre grid in the exposed slab edge.
Concept visualisation

Proposed prototype

We propose a ribbed concrete module with prestressed carbon-fibre reinforcement.

First test

The first study pairs an assessment of one existing building with a prototype floor bay to evaluate anchorage, cracking, deflection and vibration.

Research notes & references

Design targets

The plate between the ribs is aimed at 30–40 mm. Total depth, including the ribs, is reported separately. The comparison is a 220–250 mm reinforced-concrete slab where that thickness fits the reference span and loads. A 60–70% reduction in structural floor mass is a design target, not a measured result. Whether an additional storey is possible without foundation strengthening depends on the assessment of that building.

Method

One existing building and one floor bay would be chosen. The rib layout stays within precast production constraints, and the analysis follows the load path through the existing walls or columns into the foundations. One prototype would be made with a regional precaster and a CFRP supplier. The test covers prestress transfer, anchorage, cracking, deflection, vibration and failure mode. Fire and acoustic evidence would be defined separately before any building use.

Published references

02

Instrumented strengthening for existing bridges

How does externally applied prestress change the response of an existing girder?

Concept visualisation of a concrete bridge girder with a dark strengthening strip, steel anchor plates and a sensor.
Concept visualisation

Proposed prototype

We propose comparing mechanically prestressed CFRP with thermally activated iron-based shape-memory alloy.

First test

A before-and-after girder test would track strain, deflection, crack response and installation time.

Research notes & references

Method

The comparison is between mechanically prestressed CFRP strips and iron-based shape-memory alloy strips, Fe-SMA, activated by heating after the ends are restrained. One girder would be tested before and after strengthening under the same loading sequence. The records are effective prestress, strain, deflection, crack response and installation time. Strain and temperature measured on the strip stay separate from deflection measured by an independent instrument or inferred from a model updated with the test data. The closure window would be timed in that study. Overnight installation is one timing scenario within it. Cantonal road authorities and railway asset owners such as SBB are the audience for an assessment, strengthening and monitoring package developed with a bridge contractor and a sensor specialist.

Published references

  • Ibach Bridge, 1991, Empa / Urs Meier

    Documents non-prestressed CFRP strips. The bridge stayed open and the repair took three nights. It does not document a prestressed installation or closing a span for one night.

  • empa:3860

    Publication record for the 1991 Ibach Bridge repair.

  • Breveglieri, Czaderski and Michels, 2018

    Documents gradient anchorage on 17 m girders from a 40-year-old Swiss bridge: six prestressed CFRP strips, 1.2 × 50 mm², about 1000 MPa, about 60 kN. No mechanical anchors remained after installation.

  • Czaderski et al., empa:9485

    Documents strip tests on the alloy Fe–17Mn–5Si–10Cr–4Ni–1(V,C). The specimens were heated to 160 °C, and the recovery stress was about 250–300 MPa.

  • Shahverdi et al., empa:19790

    Documents a shear study in which memory-steel stirrups were heated to about 160–180 °C. re-fer AG in Brunnen commercialises memory-steel.

03

Robotically printed permanent formwork

Can workshop printing make complex concrete geometry economical to fabricate?

Concept visualisation of a robot printing a curved permanent formwork shell, with the nozzle at the rim.
Concept visualisation

Proposed prototype

The first pilot would print a curved column shell and cast the structural core.

First test

The finished component would be compared with conventional bespoke formwork. The comparison would cover dimensional accuracy, fabrication time, casting behaviour and installed cost.

Research notes & references

Method

One doubly curved column segment would be printed in the workshop, and the structural core then cast. The shell’s role during printing, transport, casting and service is recorded separately. A share of the structural resistance is included only where analysis and tests support it. Mixtures with recycled mineral content or alternative binders are formulations under test. Biogenic constituents stay limited to a defined formulation whose suitability can be tested.

Comparison

The measurements would be geometric deviation, printing and finishing time, stability under fresh-concrete pressure, defects at the interface and installed cost, against bespoke conventional formwork for the same geometry, finish and quantity. A three- to fourfold cost reduction is a hypothesis for that comparison. The first trial uses an existing robotic cell. Whether an ABB or KUKA cell near Lucerne is justified depends on the throughput, finishing effort and repeat demand that trial shows.

Published references

  • Burger et al., Eggshell, 2020

    Documents a 1.5 mm thermoplastic FDM shell and set-on-demand concrete. It does not document a permanent structural shell or a biogenic mix.

  • Eggshell Pavilion, Construction Robotics, 2023

    Documents columns and slabs that were printed and then demoulded. Concrete Choreography in Riom kept a printed concrete shell in place while a core was cast. That shell is printed concrete, not a recycled or biogenic mix.

04

Demountable timber–concrete composite floors

Can a floor cassette retain predictable stiffness after disassembly and reassembly?

Concept visualisation of a concrete floor slab on timber beams, joined with removable bolted connectors.
Concept visualisation

Proposed prototype

We propose a precast concrete layer connected to timber with removable mechanical shear connectors.

First test

The first test would measure connector slip, floor stiffness and component damage before and after reassembly.

Research notes & references

Design targets

A 40–50 mm precast fibre-reinforced concrete layer on LVL or glulam ribs, or on a CLT panel where the layout calls for it. The connectors are mechanical, dry and accessible for later removal. Roughly half the mass of a conventional concrete floor is a design target. A 30-year disassembly scenario would be used to study access and material recovery. A comparison with SNBS, Minergie or a public incentive applies only to the specific project and the programme rules then in force.

Method

One strip or cassette would be built. Connector load and slip, and the bending of the composite section, would be measured, then the specimen dismantled, reassembled and measured again. The records are stiffness, deflection, vibration, dismantling time and damage. Airborne sound, impact sound, fire resistance, timber moisture, concrete shrinkage and creep would be defined for the full floor build-up rather than taken from the strip test.

Published references

  • Frontiers in Built Environment, 2023

    Documents two Swiss timber-hybrid buildings. The concrete–timber connections govern disassembly. It does not document a test of a 40–50 mm cassette.

  • Journal of Building Engineering, 2021

    Documents deconstructable screw connectors and push-out tests on glulam–concrete specimens. It does not document a Swiss code or a 30-year scenario.

From simulation to physical testing

Simulation today

We run simulations in specialist engineering software, including RFEM 6 for structural analysis and COMSOL Multiphysics for coupled physical processes. Our in-house automation helps us set up repeatable studies, compare design variants and document the results.

Laboratory plans

We plan to establish our own research laboratory in Switzerland to build and test physical prototypes. Experiments will let us compare measured behaviour with simulation predictions and refine components, connections and materials before larger-scale trials.

What would you like to test?

Send the component, the site or the fabrication question, and what a pilot should help you decide.

Discuss an R&D pilot